Industry

Contact

SCHAEFER + MERKIN Ingenieure GmbH
Schäufeleinstraße 5
80687 München

Contact Person: Eckhard Schaefer

As general planners, SCHAEFER + MERKIN Ingenieure design complex production and logistics facilities in industrial and plant construction.

  • Facilities for raw material extraction and processing
  • Production facilities, research institutions and laboratories
  • Installations for transport, handling and storage of materials and goods

Industrial customers appreciate the guaranteed time and costs of project management by SCHAEFER + MERKIN Ingenieure GmbH. This is based on integrated overall planning expertise, guided by structured project management.

+ Rational AG, Factory Building 3, Landsberg

Client

Rational AG

Project

New construction of a factory building in structural steel.
Length 132 m, width 102 m, heigt 10,2 m
Support grid of approx. 14 m.

Services

Parts of Structural Engineering, Preliminary and detailed design of all reinforced concrete elements such as foundation, changing rooms, central heating station, etc. as subcontractor.

Construction Costs

approx. 14 mio. €

Gross Volume

approx. 137.300 m³

Gross Floor Area

approx. 13.500 m²

Design Period

2016

Construction Period

2017 – 2018

+ Production hall Liegel, Georgensgmünd

Owner

Liegel Willi GmbH

Project

New construction of a two-store production building with precast reinforced concrete Sandwich elements.

Services

Structural Engineering

Construction Costs

approx. 1 mio. €

Gross Volume

approx. 5.600 m³

Gross Floor Area

approx. 970 m²

Design Period

2017

Construction Period

2017 – 2018

+ GSB Tankfarm and store for solid items

Owner

GSB Sonderabfall Entsorgung Bayern GmbH

Project

Rebuilding of an existing tank farm with 4 tanks, an new construction of a tank farm with 6 tanks consisting of a catchbasin, Pumpstation, stair-Tower, platforms, pipe rack and Operation building. New construction of a shelter storage for solid waste in the dimensions of 48 m x 26 m.

Services

Structural Engineering

Design Period

2016 – 2017

Construction Period

2017 – 2018

+ New construction of a 2-storey warehouse

Owner

REMONDIS ASSETS & SERVICES GmbH & Co. KG

Project

New construction of a 2-storey warehouse with reinforced concered precast elements and wooden Roof beams.

Length 42 m, width 28 m, height 10 m

Services

Structural Engineering and construction supervision

Gross Volume

approx. 11.700 m³

Gross Floor Area

approx. 1.200 m²

Construction Costs

approx. 0,7 m €

Design Period

2016

Construction Period

2016 – 2017

+ PUMA – New Logistics and Administrative building in Maisach

Client
Freudenberg Immobilien Management GmbH, Weinheim

Architect
ATP Architects, Munich

Project
New construction of a 2-storey office building in reinforced concrete and a 3-storey logistic-building in precast concrete elements. Total height 17 m.

Services
Parts of Structural Engineering

Construction Costs
approx. 43.000.000 €

Gross Volume
approx. 147.000 m³

Gross Floor Area
approx. 58.000 m²

Design Period
2015 – 2016

Construction Period
2016 – 2017

+ EADS Algae-Plant, Ottobrunn (Bavaria, Germany)

Client
EADS

Project
New Construction of a prototype plant for cultivation of algae and production of bio-kerosene.

Services
Detail Design

Gross Volume
approx. 6.300 m³

Gross Floor Area
approx. 1.600 m²

Design Period
2014

Construction Period
2014 – 2015

+ Porsche Factory Extension Cajun, Leipzig

Owner
Dr.-Ing.h.c. F. Porsche AG

Architect
Henn GmbH, Munich

Client
Hasslinger Stahlbau GmbH, Feldkirchen

Project
New construction of production buildings

Services
Detail design and structural calculations

Gross Volume
approx. 46 000 m³

Gross Floor Area
approx. 11 500 m²

Design Period
2010

Construction Period
2010 – 2011

+ Fiberboard Refiner, Baruth (Germany)

Client
Fiberboard GmbH

Project
New construction of a production plant in steel for wood fiber boards.

Services
Detail design and structural calculations

Design Period
2007

+ VW Factory, Kaluga (Russia)

Client
Volkswagen AG

Project
Building for car production in steel

Services
Detail design and structural calculations

Design Period
2010

Construction Period
2010 – 2011

+ TOBOLSK 2 Ethylen Cracker Unit (ECU), Russia

Owner
SIBUR / Zap Sib Neftekhim LLC

Client
Linde AG

Project
New Construction of an Ethylen Cracking Unit
Steel- and Concrete Structures, Buildings

Services
Detail Design, 3-D Model

Design Period
2014 – 2016

Construction Period
2015 – 2017

+ TOGLIATTI 2 Ammonia Plant With Steam Reformer, Russia

Owner
LLC Linde Azot, Togliatti

Client
Linde AG

Project
New Construction of an ammonia plant with Steam Reformer.
Steel- and Concrete Structures and Buildings.

Services
Detail Design

Design Period
2014 – 2016

Construction Period
2014 – 2016

+ BMW – MOTOR-FACTORY Shenyang in China

Owner
BMW AG

Project
Construction of steel platforms for media.

Services
Structural design and calculations according to Chinese standards considering earthquake loads.

Design Period
2014

Construction Period
2014

+ New construction of an industrial building for motor-tests for company Zeppelin, Achim

Owner
Zeppelin GmbH

Project
New construction of a four-storey industrial building in concrete,
Pre-stressed concrete roof, length 55,0 m, width 45,0 m, hight 18,0 m

Services
Structural detail design and calculations in 3D

Gross Volume
approx. 40 000 m³

Gross Floor Area
approx. 6 000 m²

Construction Costs

approx. 5,0 Mio. €

Design Period
2012

Construction Period
2012 – 2014

+ Extension of a Potassium-Salt-Plant in the werra-Plant of KALI + SALZ GmbH

Owner
KALI + SALZ GmbH

Client
Stahlbau Schauenberg GmbH

Project
New construction of a 10-storey industrial building in steel.
length 120,0 m, width 30,0 m, depth 60,0 m

Services
Detail design and calculations in 3D, workshop-drawings

Gross Volume
approx. 65 000 m³

Gross Floor Area
approx. 16 000 m²

Construction Costs
approx. 8,0 Mio. €

Design Period
2012

Construction Period
2012 – 2014

+ Porsche Factory Extension Macan, Leipzig

Owner
Dr.-Ing.h.c. F. Porsche AG

Architect
Henn GmbH, Munich

Project
New construction of two buildings in steel for production of car bodies and logistics.

Services
Detail design and structural calculations

Gross Volume
approx. 256 000 m³

Gross Floor Area
approx. 65 500 m²

Design Period
2012

Construction Period
2012 – 2013

+ Air Separation Plant Mirfa 1, Abu Dhabi

Client
Linde Middle East Ltd., Abu Dhabi

Project
Basic-, Authority- and Detail-Design for all buildings and structures including formwork- and reinforcement drawings. Design of 5 buildings with roads, water- and sewage lines and cable troughs.

Services
Basic-, Authority- and Detail-Design.
Quantity take off and preparation of bill of quantities

Order Value
1.265.000,00 €

Construction Costs
approx. 160 Mio. €

Design Period
2009

Construction Period
2009 – 2011